FEATURED PROJECTS
MANUFACTURING
Project: Toyo Tire North America, Inc.
White, GA - 838,743 SF
KBD Group was hired to provide design, preconstruction, and general construction services for a 838,743 SF tire manufacturing plant expansion. KBD Group is working closely with Toyo Tire and their Process Equipment vendor to ensure seamless design and integration of all of the process equipment installation. This...
Project: Hill's Pet Nutrition
Emporia, KS - 524,034 SF
KBD Group was hired as a design/build firm to oversee design and construction of this pet food manufacturing facility. Included in the scope of work was a process mill, packaging, storage and office building. In addition to the structures being constructed KBD Group was also responsible for the complete process...
Project: Alienware
Miami, FL - 73,000 SF
KBD provided general contracting services for this 25,000 SF, two-story office building and 48,000 SF manufacturing and distribution facility. This building consists of a multi-story tilt wall and two radius panels at the front entrance. KBD also provided site grading, paving and utilities along with the...
Project: Nichiha USA, Inc.
Macon, GA - 413,300 SF
KBD Group provided design and construction management services for this, 413,300 SF manufacturing facility including an office building, a warehouse, a boiler building and a waste water treatment facility. Various exterior areas and a loop of paved roadways were also part of the overall dedicated support of the...
Project: BAE Systems, Port Union Bldg F
Hamilton, OH - 292,500 SF
KBD Group provided General Contracting services for a 292,500 SF tenant fit out for Armor Holdings. Armor Holdings is an aerospace and defense group acquired by BAE Systems. The scope of work included the construction of offices and warehouse improvements to accommodate the assembly and fit out...
Project: Hitachi Semiconductor
Irving, TX - 400,000 SF
KBD provided complete design/build services expanding Hitachi Semiconductor’s Irving, Texas facility with a new 400,000 SF32-bit RISC Processor fabrication plant incorporating a 70,000 SF cleanroom and a 10,000 SF test area. Work also involved specialty gas and chemical distribution, bulk gas distribution,...
Project: Hitachi Electronic Devices
Greenville, SC - 422,500 SF
KBD Group provided design/build services for the 422,500 SF electron tube manufacturing facility and attached 50,000 SF corporate office. Later project phases included a 58,000-square-foot storage addition of the Hitachi warehouse building 58 and 54 of the existing manufacturing facility. Major building features...
Project: Suzuki ATV Assembly Plant
Rome, GA - 100,000 SF
KBD Group provided design/build services for the 100,000 SF All Terrain Vehicle Assembly Plant. The first Suzuki assembly plant is located on the 35 acres site.
Project: Ricoh Electronics
Lawrenceville, GA - 347,000 SF
KBD provided design/build services for the 129,000 SF office building and toner manufacturing facility. Design/Build services were also provided for a 110,000 SF expansion to the existing plant and an additional 108,000 SF dry toner facility.
Project: Fuji Film
Greenwood, SC - 2,000,000 SF
KBD Group provided design/build services for approximately 40 projects from1988 – 2005 for Fuji Film. Including HQ office and sophisticated plant manufacturing PS Plate, Video Tape, Quick Snap Camera, Photo Film, Photo Paper, etc.; with clean room and dark room. These projects totaled more than 2 million SF of...
Project: Caterpillar Inc.
Waco, TX - 110,000 SF
KBD Group provided design/build services for Caterpillar’s 110,000 SF Articulated Truck Assembly Plant including 10,000 SF Office Space and 2,600 SF Customer Service Area located on a 104 acre site in Waco, Texas.
Project: Astellas Pharma US, Inc.
Norman, OK - 119,450 SF
KBD Group provided design/build, construction management, process equipment relocation and installation, and validation services for the expansion, renovation, and consolidation of Astellas Pharma’s solid-dosage plant where they manufacture and bottle a variety of film-coated tablets. The facility now includes a...
Project: House Foods
Garden Grove, CA - 141,800 SF
KBD Group provided design/build services for the 141,800 SF tofu manufacturing facility, which included refrigeration and freezer storage rooms, office and warehousing, steam, hot water, chilled water and compressed air systems. KBD Group also provided Design/Build services for the addition of two process lines in...