FEATURED PROJECTS
MAJOR PROJECTS UNDER CONSTRUCTION
Project: 452 Fifth Ave Lobby Renovation
New York, NY - 3,700 SF
KBD Group is providing CM/GC with Pre-Construction Services. The scope of work includes the replacement of the building entrance atrium glass structure with a modern glass atrium. The lobby interior will be completely renovated with new stonework and glass. A Section of the lobby floor structure with steps will be...
Project: Cargil Barge Transfer Facility
Halespoint, TN - 8 Acre Site
KBD Group is providing Design Build services for this barge transfer facility expansion on the Mississippi River. Project includes 1 million bushels of working/storage space, new truck receiving systems, new barge loading system and new office building with demolition of existing access road and two existing...
Project: Toyo Ink
Bryan, TX - 18,300 SF
KBD Group is providing complete Design/Build services for this expansion of an ink manufacturing facility. The scope includes a 13,800 SF expansion of an existing warehouse, a 4,500 SF expansion of the production building, including hazardous, blast resistant storage areas; rated Class 1/Division 1 as well as Class...
Project: Nippon Sharyo Manufacturing Facility
Rochelle, IL - 460,000 SF
KBD Group is providing Design/Build services for a 460,000 SF rail car manufacturing facility. Scope includes 20,000 SF of two story office area, rail tracks on site and throughout interior of the facility, and precast concrete exterior walls.
